Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

Home

Citizen Charter

Divisions

Department

Tenders & Bill Status

News & Updates

Contact Us

Divisions
   Chakradharpur
      DEPARTMENT
         MECHANICAL
            ASSETS


 
Bookmark Mail this page Print this page
QUICK LINKS
ASSETS

ASSETS

Freight :BNDM

Depot /Yard

Infrastructure

Category as RBnorms

Activity

Avg outturn / month(13-14)

Central Sick Line

Cover shed-120 x 25& 80 x 25 sqm

EOT cranes -4 nos

SWL –Under commissioning

DG set, Shearing m/c , air compressors etc – Available

Road mobile crane – Available

A

ROH

280

Sick repair

619

MSL

Cover shed-120 x 25sqm

EOT cranes -2 nos

SWL –Available(over-aged)

Air compressors etc – Available

DG set – Available

Rail crane – Available

A

Sick repair

526

Exchange Yard

CC pathway -16 lines

Lighting -12 lines

Welding -4 lines

Air comp- 400 cfm x 2

High mast tower light – 2 nos .

A

PME

40

PREMIUM

75

INTENSIVE

60

Departure yard

CC pathway -12 lines

Lighting -8 lines

Welding -8 lines

Air comp- 450 cfm x2

A

PREMIUM

67

INTENSIVE

83

 

 

 

 

Freight :ADTP

Depot /Yard

Infrastructure

Category as RBnorms

Activity

Avg outturn / month

SICK line

Cover shed-120 x 22sqm

EOT cranes -2 nos

Air compressors etc – Available

Road mobile crane – Available

A

Sick repair

898

ROH Shed

Cover shed-110 x 22sqm

EOT cranes -2 nos – under commissiong

Air compressors etc – Available

DG set – Available

SWL – Available

A

ROH

103

ADTP Yard

CC pathway -13 lines

Lighting -10 lines

Welding -10 lines

Air comp- 400 cfm x 2

High mast tower light – 5 nos .

A

PME

26

PREMIUM

82

INTENSIVE

46


Freight :TATA

Depot /Yard

Infrastructure

Category as RBnorms

Activity

Avg outturn / month

ROH cum SICK line

Cover shed-100 x 25& 40 x 25 sqm

EOT cranes -4 nos

SWL –sanctioned

Air compressors etc – Available

Rail crane – Available

A

ROH

68

Sick repair

252

Main Yard

CC pathway -8 lines ,

Air comp- 300 cfm

D

PME

1

PREMIUM

90

INTENSIVE

75

CF yard

CC pathway -10 lines

Air comp- 500 cfm

High mast light -5 nos

C

No separate gang available for CF Yard and as per requirement gangs of Main Yard are used for examination.


Freight :DPS

Depot /Yard

Infrastructure

Category as RBnorms

Activity

Avg outturn / month

SICK line

Sanctioned under PWP-12-13

Cover shed- 80 x 25 sqm

EOT cranes -2 nos

DG set, air compressors etc

Rail crane – Available

Comp- 450 cfm

F

Sick repair

272

DPS Yard

CC pathway -5 lines , 4 sanctioned

Lighting -6 lines sanctioned

Welding -2 lines

Air comp- 450 cfm

B

PME

9

PREMIUM

13

INTENSIVE

96


Coaching :TATA

Activity

Present Infrastructure

Capacity

Work load

Primary Maint.

Pit line No.1 – 436 mts.

Pit line No.2 -540 mts.

Pit Line No.3 – 540 mts.

20 coaches

24 coaches

24 coaches

M/E- 7

Pass- 5

Coach holding

-

-

385

AC-40

Non AC -345

IOH

IOH shed

Two coach

31 per month(13-14)

Sick repair

Covered area

Two coach

22 per month

Watering

6’’ dia watering hydrants on all 5 PFs

24 coach length each

32 trains

Rolling in

UP & DOWN

All PF lines

68trains

 

Coaching :ROU

Activity

Present Infrastructure

Capacity

Work load

Primary Maint.

Line No. 1 non pit

Pit line No.2 – 315 mts.

Pit line No.3- 395 mts.

17 coaches

14 coaches

17 coaches

M/E- 3

Pass- 4

Coach holding

-

-

146

AC-18

Non AC -128

Sick repair

Covered shed

One coach

14 per month

Watering

4’’ dia watering hydrants on all 5 PFs. Work for conversion to 6” dia sanctioned under MWP ’12-13 under PH-53

24 coach length each except PF 1

55 trains

Rolling in

UP & DOWN

All PF lines

57 trains

CTS

All 5 PFs

24 coach length train

27 trains


Coaching :JSG

Activity

Present Infrastructure

Capacity

Work load

Primary Maint.

Pit line No.1 – 262 mts.

12 coaches

Pass- 4

Coach holding

-

-

54

Sick repair

Open area. Work for covered shed and service building sanctioned under LAW ’13-14 under PH-42.

One coach

SICK -5

Watering

4’’ dia watering hydrants on all 5 PFs

24 coach length each

14 trains

Rolling in

UP & DOWN

All PF lines

42 trains

 

Running:

Facility

Location

Capacity

Combined Crew lobby

ADTP

AVG TO PER DAY :32

BNDM

AVG TO PER DAY :79

JSG

AVG TO PER DAY :14

RunningRoom

KMPD

46 BEDS

BXF

26 BEDS

BUF

12 BEDS

RCD

TATA

147.2KL X 2 ( 453KL/MONTH )

DPS

180KL X 4(125KL/MONTH)

JSG

210KL X 3(703 KL/MONTH )


Disaster Management:

Location

ART

ARME

Class

Type of HRE

Crane

TATA

B

MFD

-

Scale-I

CKP

A

BEMCO

140 T new design

Scale-I

DPS

B

BEMCO

-

Scale-I

BNDM

A

BEMCO

140 T new design

Scale –I

JSG

B

BEMCO

-

POMKA


EIMWBs:

Location

Make

Capacity

BUF

RLWSL

120 T

D/yard BNDM

RLWSL

120T

JRLI(OLD)

RLWSL

120 T

JRLI(NEW)

RLWSL

120 T

DPS(1)

RLWSL

120 T

BJMD

RLWSL

120 T

DPS(2)

RLWSL

120 T

CSL/BNDM

SENLOGIC

120 T

BDO

DWS

120T

UNDER COMMISSIONING :

SECTION

SITE

MAKE

STATUS

BNDM-ROU

LINE NO 6 ROU –KRMD LOOP LINE AT ROU YARD

RLWSL

As per advice of Operating department, this weighbridge shall now be shifted to LTK in BNDM-BUF section.


Wheel Impact Load Detector (WILD):

Location

Make

Limits

MMV Dn Main line

Apna Technology Chennai

Maintenance limits :

ILF 2 to 4.5 or

Maximum load : >20 to 35 T

Critical limit :

ILF > 4.5 or

Maximum load> 35T








Freight: BNDM

Depot /Yard

Infrastructure

Category as RBnorms

Activity

Avg outturn / month

CSL

Cover shed-120 x 25& 80 x 25 sqm

EOT cranes -4 nos

SWL –sanctioned

DG set, Shearing m/c , air compressors etc – Available

Road mobile crane – Available

A

ROH

269

Sick repair

732

MSL

Cover shed-120 x 25sqm

EOT cranes -2 nos

SWL –Available

Air compressors etc – Available

DG set – sanctioned

Rail crane – Available

A

Sick repair

589

Exchange Yard

CC pathway -15 lines

Lighting -6 lines

Welding -2 lines

Air comp- 400 cfm x 2

High mast tower light – 2 nos .

A

PME

56

PREMIUM

93

INTENSIVE

39

Departure yard

CC pathway -10 lines

Lighting -8 lines

Welding -8 lines

Air comp- 450 cfm x 2

A

PREMIUM

49

INTENSIVE

60

 

Freight :ADTP

Depot /Yard

Infrastructure

Category as RBnorms

Activity

Avg outturn / month

SICK line

Cover shed-120 x 22sqm

EOT cranes -2 nos

Air compressors etc – Available

Road mobile crane – Available

A

Sick repair

693

ROH Shed

Cover shed-110 x 22sqm

EOT cranes -2 nos(sanctioned )

Air compressors etc – Available

DG set – sanctioned

SWL – under commissioning

A

ROH

75

ADTP Yard

CC pathway -13 lines

Lighting -4 lines

Welding -2 lines

Air comp- 400 cfm x 2

High mast tower light – 5 nos .

A

PME

20

PREMIUM

110

INTENSIVE

29




Freight :TATA

Depot /Yard

Infrastructure

Category as RBnorms

Activity

Avg outturn / month

ROH cum SICK line

Cover shed-100 x 25& 40 x 25 sqm

EOT cranes -4 nos

SWL –sanctioned

Shearing m/c , air compressors etc – Available

Rail crane – Available

A

ROH

67

Sick repair

285

Main Yard

CC pathway -8 lines ,6 linesU/C.

Lighting -6 lines U/C

Welding -6 lines U/C

Air comp- 300 cfm

D

PME

1

PREMIUM

95

INTENSIVE

43

CF yard

CC pathway -10 lines

Air comp- 500 cfm

High mast light -5 nos

C

Shortage of manpower

Freight :DPS

Depot /Yard

Infrastructure

Category as RBnorms

Activity

Avg outturn / month

SICK line

Sanctioned under PWP-12-13

Cover shed- 80 x 25 sqm

EOT cranes -2 nos

DG set, air compressors etc

Rail crane – Available

Comp- 450 cfm

F

Sick repair

201

DPS Yard

CC pathway -5 lines , 4 sanctioned

Lighting -6 lines sanctioned

Welding -2 lines

Air comp- 450 cfm

B

PME

9

PREMIUM

6

INTENSIVE

74

 


Coaching :TATA

Activity

Present Infrastructure

Capacity

Work load

Primary Maint.

2 pit lines ( 436mts each )

19 coaches

M/E- 7

Pass- 5

Coach holding

-

-

390

AC-40

Non AC -350

IOH

Temporary shed

One coach

21 per month

Sick repair

Open area

One coach

25 per month

Watering

6’’ dia watering hydrants on all 5 PFs

24 coach length each

25 trains/day

Rolling in

UP & DOWN

All PF lines

35 trains /day


Coaching :ROU

Activity

Present Infrastructure

Capacity

Work load

Primary Maint.

1 pit line ( 395mts each )

17 coaches

M/E- 3

Pass- 4

Coach holding

-

-

146

AC-19

Non AC -127

Sick repair

Covered shed

One coach

10 per month

Watering

4’’ dia watering hydrants on all 5 PFs

24 coach length each except PF 1

41 trains/day

Rolling in

UP & DOWN

All PF lines

35 trains /day

CTS

All 5 PFs

24 coach length train

24 trains


Coaching :JSG

Activity

Present Infrastructure

Capacity

Work load

Primary Maint.

1 pit line ( 262mts each )

12 coaches

Pass- 4

Coach holding

-

-

60

IOH &Sick repair

Open area

One coach

IOH -8 & SICK -5

Watering

4’’ dia watering hydrants on all 5 PFs

24 coach length each

28 trains/day

Rolling in

UP & DOWN

All PF lines

42 trains /day


Running Rooms, Lobbies, RCD

Facility

Location

Capacity

Combined Crew lobby

ADTP

AVG TO PER DAY :23

BNDM

AVG TO PER DAY :63

JSG

AVG TO PER DAY :11

RunningRoom

KMPD

56 BEDS

BXF

24 BEDS

BUF

12 BEDS

RCD

TATA

147.2KL X 2 ( 453KL/MONTH )

DPS

180KL X 4(125KL/MONTH)

BNDM

980KL X7 ( 731KL/MONTH)

JSG

210KL X 3(703 KL/MONTH )


Disaster Management

Location

ART

ARME

Class

Type of Equipment

Crane

TATA

B

MFD

-

Scale-I

CKP

A

BEMCO

140 T new design

Scale-I

DPS

B

MFD

-

Scale-I

BNDM

A

MFD

140 T new design

Scale –I

JSG

B

BEMCO

-

POMKA


Targets & Performance

Item

Target 11-12

Performance 11-12

Target 12-13

Performance 12-13(upto July)

ROH(VU/M)

305

418

410

411

Ineffective (% of holding )

2.5(1.35)

1.60

2.5(1.35)

1.64

Train parting (nos.)

36

14

20

11

Hot axle (nos.)

13

4

9

7

PME time (HH:MM)

6:00

5:47

6:00

5:45

Premium time(HH:MM)

4:30

3:48

4:30

3:43

Intensive Time (HH:MM)

3:00

2:39

3:00

2:41

Premium exam (nos./month )

-

280

-

352

Coach Detachment(nos.)

-

2

-

NIL

Spring Breakage

0

0

0

0

Wagon rejection(nos./m)

-

24

-

10

Sick/Rake(PME)

-

7.29

-

5.35

Sick/Rake(Premium)

-

3.07

-

3.22

 

 




Source : South Eastern Railway CMS Team Last Reviewed : 22-05-2014  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.