Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

Home

Citizen Charter

Divisions

Department

Tenders & Bill Status

News & Updates

Contact Us

Department
   Signal & Telecommunication
      Training Center
         STTC/KGP
            History


 
Bookmark Mail this page Print this page
QUICK LINKS
History


SIGNAL & TELECOM TRAINING CENTRE

KHARAGPUR, S.E.RAILWAY

 

 

 

 

 

 

 

 

 

 

 

 

 

       SIGNAL & TELECOM TRAINING CENTRE

KHARAGPUR, S.E.RAILWAY

6TH AVENUE, SOUTH SIDE

KHARAGPUR, WEST MIDNAPUR

PIN-721301;WEST BENGAL

        SIGNAL & TELECOM TRAINING CENTRE, KHARAGPUR, S.E.RAILWAY



Brief History




S

&T Training Centre, S.E.Railway, Kharagpur, started functioning during 1960’s with a mission for training of S&T artisan staff. Theoretical and Practical classes used to be conducted in Signal Workshop, KGP. Subsequently during 1963 the Training Centre was shifted to System Training School, (present STC) Kharagpur, S.E.Railway with the shared accommodation both in classroom and hostel. Due to advancement of S&T installation the necessity of establishing a separate training school for the S&T discipline was felt. Accordingly a separate training school for S&T artisan staff came into existence during November 1981 with its own building, demonstration yard etc. In the first phase one double storied building for S&T Training Centre along with a single storied hostel building was constructed and finally it was formally inaugurated by the then Honorable Railway Minister Mr.A.B.A.Ghani Khan Chowdhury on 23rd September, 1983.

 

            With the rapid introduction of advanced & improved type of Signalling and Telecommunication system it was felt necessary for augment of training capacity. As a result one Annexure Building for S&T Training Centre along with the first floor of the trainee hostel was constructed during 1994.The Hostel capacity of the Training Centre was increased up to 120 trainees per session.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2)

1.GENERAL INFORMATION.

 

I.Location of the Training Centre:On the 6th Avenue at

the Southend Side of Kharagpur.

 

 

II.Postal address:Signal & Telecom Training Centre,

S.E.Railway.

6th Avenue, South Side, Pin 721301, Kharagpur. Dist:West Midnapore.West Bengal.

 

III.Telephone Numbers:Railway Kharagpur :Principal = Office=62418(RLY),

Residence= 62419(RLY).

Chief Instructor: Office=62720(RLY)

62721 (RES)

STTC Office: 62720 (RLY).

FAX: 63065 (RLY)

DOT (BSNL): 03222-255469.

E-Mail: psttckgp@ser.railnet.gov.in

 

IV.Total area of the Training Centre: Area of the Campus = 172 mt. X 114 mt.

= 19608 sq. Mt. approx.

 

V.Timings:

 

Office Hours:

08/15-12/15 Lunch Break 12/15-13/15

13/15-17/15

Saturday: Half Working day (08/15-12/15)

Sunday & Holiday: Remain Closed.

 

Classes (Hrs):

Session ISession IITea BreakSession IIISession IV

Hrs.08.30/09.20 09.20/10.1010.10/10.3010.30/11.2011.20/12.10

 

LUNCH BREAK:12.10 – 13.40

 

Session VSession VITea BreakSession VII

Hrs13.40/14.-1014.40/15.4015.40/16.0016.00/17.00

Library (Hrs.)As per routine .

 

 

 

 

 

 

 

 

(3)

 

 

2.INFRASTRUCTURE OF TRAINING CENTRE :

i)Classrooms:

Total Class Room = 05 Classrooms.

Class Room capacity= 25-30 each (in average).

Sitting arrangement=Combined wooden desk and chair (Individual)

 

 

ii) Laboratories:There are 7 laboratories equipped with Signal and Telecom

Equipments for the purpose of practical training.

SIGNAL LAB: a) Block and signalLab, b) RRI Lab,c) SSI Lab &

d)MODEL YARDe) IPS. Lab

TELECOM LAB: a) MW &Wireless Lab, b) Landline, Exchange Lab &

c)Computer & e-Learning Lab.

iii. Seminar Hall : Seating capacity 40 – 45 seats.

 

3.FACILITY AVAILABLEFOR PRACTICAL DEMONSTRATION ON SIGNAL AND TELECOM SUBJECTS:

 

Block and Signal Lab: The Block lab is equipped with all types of Block

Instrument used in S.E.Railway & a model of Automatic signaling section and DC track circuit model.

RRI Lab:The RRI lab is equipped with a) Siemens RRI (two line stn with

Operating panel) b) British type RRI (two line stn with operating panel and simulation panel of automatic signaling connected with model yard,Datalogger and Eldyne make SSDAC .

EILab:A training EI of two lines Stations along with point & signal

have been installed by S&T construction organisation during February’2002 with single system and warm stand by system is installedin year 2009.

Model Yard:The Model Yard with 4 lines, length 145 mtrs (approx. route

Length) is equipped with Lever frame, Semaphore signal, CLS, Mechanical & Electrical point & one set of Level crossing gate (Lifting barrier type). 4 No. of automatic signals are installed by S& T construction during year 2010.

4-D Universal axle counter, Single section digital axle counter CEL make. Motor signal & Reverser signal etc.

Mechanical Signalling Equipment: Mechanical Siganlling Equipment i.e. Locking tray with locking indication (Direct / IRS catch handle type); various mechanical signalling spares are provided for identification purpose.

MW &Wireless Lab: Wireless lab equipped with active and passive

 

(4)

 

components, PA system, equpts for study of different type of GATES, 25 watt VHF set, 2 watt VHF set, DTL MUX, 7D6 Radio equipments etc.

Landline & Exchange Lab: Land line lab is equipped with different types of

Auto telephone, all types of Emergency portable telephone, Head qr. & Way station Control equipment (17 impulse & DTMF type), Optical fibre testing kit, different types of Telecomcables

Electronic Exchange (CDOT-128 port), OFC OLTE (WEBFIL make)

Computer e-Learling Lab : Computer Lab is equipped with 10nos. of PC.

Video Conferencing Room:One room is for Video conferencing with the

entire Zonal Traing centre (S&T) and IRISET/SC.

 

 

4.Provision of training facility

i)Details of Training Aids :

oBlack board & white board (Frosted Glass) in classroom.

oWall chart, Painted drawing boards

oOHP & Screen

oTV / VCR / DVD Player(for audio-visual training)

oProjection TV(29”)

oPhotocopier Machine

oDigital Scanner cum Printer

oPC with Printer

ii) Library facilities: New Library room is constructed in year 2010.

The Library is equipped with Technical Books on Signal & Telecom, Manuals, Magazines, Journals, etc.

Total Nos.=3500 (approx.)

 

5.FACULTYMEMBERS:

i) Sri Anil Ch. Gharai [Principal (ADSTE)]

ii)Sri D.Mukhopadhyay[Chief Instructor (SSE/SIG]

iii)Signal Instructor = 05

iv)Telecom Instructor = 06

 

 

 

 

 

 

 

 

 

 

 

 

6.OBJECTIVES OF THE TRAINING CENTRE:

Details of Training Courses are Conducted (as per approved module for stage wise Training of Gr. ‘C’ including 40% intermediate J.E.(Sig) & 30% intermediate J.E (Tele) & Gr. ‘D’ staff of S&T Department (. August’99, Railway board module).

Sl No.

Course no.

General Courses

Duration (in weeks)

1.

SNT-1

Induction to unskilled Group ‘D’ (Signal & Telecom)

02

2.

SNT-2

Initial Course for Apprentice ESM/SM Gr.III

08+09

3.

SNT-2

Initial Course for Apprentice ESM/SM for Gr.II

08+09+08

4.

SNT-3

Initial course for Apprentice TCM/WTM

08 + 09

5.

SNT-4/5/6

Refresher course for ESM/MSM/SM/TCM/WTM

03 (EACH)

6.

SNT-7

Equipment Courses for Signal Artisan staff on different subjects.

1 / 2

7.

SNT-8

Equipment Courses for Telecom Artisan staff on different subjects.

1 / 2

9.

SNT-10

Foundation Course for Promotees ESM/MSM Gr.III

8

10.

SNT-11

Foundation Course forpromotees TCM /WTM Gr.III

8

12.

SNT-20

Induction course for Apprentice JE/SE (Sig & Tele)

03

13.

SNT-21

Pre promotional course for ASTE, Gr-B selection

3/4

 

 

Sl No.

ExtraCourses

Duration

1.

Introduction of signaling to LI/CLI/LP of elect(loco) department

02 days

2.

Introduction of signalingand panel operation to ASM/SM/SMR of operating Department.

02 days

3.

Panel operation for ASM/SM/SMR for refresher trainees of ZRTI/SINI of operating Department

01 day

4.

Disaster Management trainees for supervisors and artisans of S&T Department.

05 days

 

Total number of courses conducted in a year =100(in average).

Course conducted last year (2012) = 99Courses. (Signal: 49& Telecom: 50)

Courses planed for 2013:130courses (Signal: 73 & Telecom: 52, Black Smith: 05 )

Courses conducted till this year upto March 2013: 20 courses (Signal: 14 & Telecom: 06)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.DETAILS OF COURSE CONDUCTED & UTILISATION OF SEATS

 

STATEMENT SHOWING THE PERFORMANCE OF STTC/KGP

Jan 2012 - Dec’2012

Srl No.

Name of the Training Programme

Duration of Training

(in weeks)

Dec’12

Total Course conducted fromJan’12

 

Total staff attended from

Jan’ 12

No. Of Course conducted

 

Seat allotted

 

Attended*

1.

Refresher ESM/MSM

03

2

50

44

14

336

2.

Refresher TCM/WTM

03

1

50

36

12

217

3.

Equipment ESM/MSM

01 / 02

2

20

19

9

102

4.

Equipment TCM/WTM

01 / 02

4

80

32

24

219

5.

Induction SIG KSI

01/ 02

NIL

NIL

NIL

3

18

6.

InductionTELE/MW KSI

01 / 02

NIL

NIL

NIL

10

71

7.

Initial Appr.SM (PH-I)

08

NIL

NIL

NIL

1

32

8.

Initial Appr.SM (PH-II)

09

1

32

32

2

82

9.

Initial Appr.SM (PH-III)

08

NIL

NIL

NIL

1

46

10.

Initial Appr.WTCM(PH-I)

08

NIL

NIL

NIL

1

6

11.

Initial Appr.WTCM(PH-II)

09

NIL

NIL

NIL

1

6

12.

Foundation Course for PromoteesWTCM-III

08

NIL

NIL

NIL

2

23

13.

Foundation Course for Promotees ESM-III & MSM-III

08

NIL

NIL

NIL

04

101

14.

Inter Appr. ForJE-II(Tele)Ph-I

8

NIL

NIL

NIL

1

6

 

Inter Appr.ForJE-II(Tele)Ph-II

9

NIL

NIL

NIL

1

7

15.

Inter Appr. ForJE-II (Sig) Ph-I

8

NIL

NIL

NIL

1

6

16.

Inter Appr. ForJE-II (Sig) Ph-II

9

1

6

6

1

6

17.

Introduction Course for SE/JE(SIG/Tele)

 

04

NIL

NIL

NIL

5

22

18.

Panel Operation training/seminar for ASMs /SMs of SER

01day

2

45

45

10

335

19.

Gr’B’ Promotional Course for SE&SSE’s

03

NIL

NIL

NIL

1

10

20.

Disaster Management( Sup. & Artisien)

01

NIL

NIL

NIL

NIL

NIL

21

Appreciation for SM-II&III

01

NIL

NIL

NIL

NIL

NIL

TOTAL à

--

13

283

214

105

1684

 

Total attended upto December ’12:1684

Cumulative Training Capacity from 1st Apr’12 to Jan 2013:24650

Total Trainee days from 1st April 2012 to the Jan 2013:16514

Cumulative seat Utilization:66.99%

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(6)

STATEMENT SHOWING THE PERFORMANCE OF STTC/KGP

Feb’2013

Srl No.

Name of the Training Programme

Duration of Training

(in weeks)

Feb ’13

Total Course conducted fromJan’13

 

Total staff attended from

Jan’ 13

No. Of Course conducted

 

Seat allotted

 

Attended*

1.

Refresher ESM/MSM

03

2

50

50

3

72

2.

Refresher TCM/WTM

03

1

20

16

2

34

03.

Equipment ESM/MSM

01 / 02

4

60

36

6

51

4.

Equipment TCM/WTM

01 / 02

1

15

10

2

17

5.

Induction SIG KSI

01/ 02

1

10

7

4

21

6.

InductionTELE/MW KSI

01 / 02

NIL

NIL

NIL

1

7

7.

Initial Appr.SM (PH-I)

08

NIL

NIL

NIL

NIL

NIL

8.

Initial Appr.SM (PH-II)

09

NIL

NIL

NIL

NIL

NIL

9.

Initial Appr.SM (PH-III)

08

01

13

13

01

13

10.

Initial Appr.WTCM(PH-I)

08

NIL

NIL

NIL

NIL

NIL

11.

Initial Appr.WTCM(PH-II)

09

NIL

NIL

NIL

NIL

NIL

12.

Foundation Course for PromoteesWTCM-III

08

01

36

20

01

20

13.

Foundation Course for Promotees ESM-III & MSM-III

08

NIL

NIL

NIL

NIL

NIL

14.

Inter Appr.ForJE-II(Tele)Ph-I

8

NIL

NIL

NIL

NIL

NIL

 

Inter Appr.ForJE-II(Tele)Ph-II

9

NIL

NIL

NIL

NIL

NIL

15.

Inter Appr. ForJE-II (Sig) Ph-I

8

NIL

NIL

NIL

NIL

NIL

16.

Inter Appr. ForJE-II (Sig) Ph-II

9

NIL

NIL

NIL

NIL

NIL

17.

Introduction Course for SE/JE(SIG/Tele)

 

04

03

03

03

6

6

18.

Panel Operation training/seminar for ASMs /SMs of SER

01day

01

53

53

03

119

19.

Gr’B’ Promotional Course for SE&SSE’s

03

NIL

NIL

NIL

NIL

NIL

20.

Disaster Management( Sup. & Artisien)

01

NIL

NIL

NIL

NIL

NIL

21

Appreciation for SM-II&III

01

NIL

NIL

NIL

01

03

TOTAL à

--

15

260

215

29

363

 

Total attended up to Feb ’13=363

Actual attended=149

 

 

 

 

 

 

 

 

 

 

(7)

 

9. STTC Campus Facility:

 

1.Two bed Ac guest room for officers is provided with separate entrance and exit.

2.YOGA facilities: A Yoga session for all the traineesis conducted at morning time by private yoga instructor.

3.Library facilities: The modern Library is equipped with Technical Books on Signal & Telecom, Manuals, Magazines, Journals, IRISET and IRCAMTECH notes of sig & tele .

4.Drinking water : The drinking water facilities is available with aquagaurd.

5.Beautification and environment development with greeneries and seasoned flowers.

 

10. HOSTEL FACILITY:

 

Accommodation:

 

There is a two-storied building in the same campus of the Training Centre. Total rooms = ground floor=21 Nos & First floor = 16 Nos.

Total Living room (Ground floor = 15 Nos., First floor = 15) = 30 Nos,Total capacity=120 beds (approx)Capacity of Dinning Hall=72 .

 

Ladies accommodation :Separate three rooms along with bath rooms and toilets

 

Messing facilities: The mess is managed by a committee comprising

Representative from the trainees and a few members of

S&T Instructors. Cooking, serving& Cleaning of

Commodities done through Contractor.

Drinking water :The drinking water facilities is available with

aquagaurd.

 

Kitchen facilities:provided by commercial chimney (Kuchina

Make ) to balance the environment of dining

hall as well as kitchen.

 

  Recreation facility:

1.Common recreation room: provided with 29” TV and indoor games facility.

2.Ladies recreation room: provided with TV.

Internet : one separate room is equipped with PC with broadband

 

11.Medical facilities:S.E.Railway Kharagpur Main Hospital is within1Km.

from the Training Centre. Trainees availtheMedical

facility through Main Hospital.

 

12.Sports facilities available:

Indoor games: a) Chess, b) Carrom, c) Table-Tennis.

Outdoor games: a) Badminton, b) Volley ball, c) Football d) Cricket.

13.Mission for improvement & augment of Training facility:

(Our weaknesses)

·Modernization of the five no. class rooms and seminar hall, principal room and office room.

·Provision of modern signaling equipments like MSDAC, BPAC by Block Panel, WESTRACE EI, IBS with UFSBI, RDSO panel etc.

·Provision of modern Telecom equipments like TEJAS STM-I, IPIS etc

·Modification for ladies accommodation in hostel.

·Provision of the separate yoga place.

·Provision for requisite furniture at Trainee class room.

·Provision for modern teaching aids in each class room.

·Provision for one Basket Ball court at Trainee Hostel to improve sports activity.

·Construction of one auditorium sitting capacity 120-130 at the Training Centre campus.

 

 

Kharagpur

05.03.2013(A.C.Gharai)

Principal

S&T Training Centre

Kharagpur, S.E.Railway

 

 

 

 

 

 




Source : South Eastern Railway CMS Team Last Reviewed : 09-11-2015  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.