TRACTION DISTRIBUTION OVERVIEW OF CHAKRADHARPUR DIVISION

Introduction of 25 kV AC traction over Indian railways:


Chakradharpur division of South Eastern Railways has got the distinction for first introduction of 25 KV electric traction in Indian Railways. It was decided to inaugurate 25 kV AC traction over Indian Railways on 15th December1959 on the occasion of the meeting in Delhi of International Association of Railway Congress Permanent Commission (AICCF). A transformer and a circuit breaker taken on loan from SNCF were commissioned within 10 days at the site near Kendposi ,OHE was energised on 25kV AC from Kendposi to Rajkharswanand the pantograph of Loco no. 20250 was raised at Kendposi on 12th December 1959. (Fig.1). On 15th December 1959, the official inauguration ceremony took place in presence of AICCF officials when steam special train and electric loco ran parallel on the 3 km double track between the feedingpost site to Kendposi station. The entire Rajkharsawan - Dangoaposi section was officially inagurated for electric traction on 11th August 1960. The maintenance was started with one OHE maintenance depot at Chaibasa and the maintenance was carried out by motor trolley and with ladder with a limited OHE staff. Later on TATA-Jharsuguda main line and NXN-BNDM-BXF-KRBU branch line sections were electrified.


 
 
 

 1st Loco 20250 ready to raise its pantograph                  Commissioning of Transformer and

(Fig. 1)Circuit breaker at Kendposi

   (Fig. 2)

The chronology of electrification over Chakradharpur Division is as given below:

Sl.No.

SECTION

DATE OF COMMISSIONING

1

RKSN-DPS

11.08.1960

2

CKP-CNI,KND-GMH,SNY-ADTP

04.07.1961

3

ADTP-TATA

22.07.1961

4

CKP-MOU

03.02.1962

5

MOU-ROU

12.02.1962

6

ROU-BRMP

06.09.1964

7

BJMD-GX

27.12.1965

8

DPS-NOMD

02.02.1966

9

PDPH-DJHR

14.06.1966

10

NOMD-BJMD

14.10.1966

11

BJMD-BYX

02.12.1966

12

DJHR-BSPX

12.03.1967

13

ROU-JSG

12.04.1969

14

GMH-KND

25.08.1989

15

KND-BIRP

25.04.1990

16

BNDM-BUF-BXF

31.03.2000

17

BUF-ROXY-RGZ

11.09.2000

18

BSPX-JAROLI

21.12.2000

19

RGZ-KRBU

27.12.2001

20

BNDM-HATIA

20.09.2002

21

MCL siding/JSG

30.01.2018

22

TATA-OND-GUMI

31.03.2021

 

With the above electrification of doubling, 3rd line, 4th line and various sidings the electrified Kilometer of Chakradharpur division is become 2350 TKM as on 31stmarch 2021.

Initial power supply installations and the current scenario:
25kV AC traction started with availing 25kV traction power supply from state electricity boards.At present power supply to OHE is being given by following railway owned TSSs:

Sl. No.

TSS/FP

TKM

Capacity in MVA

MD in MVA

1

SLJR

294

2 X 30/42

23.125

2

MIK

150

2 X 21.6

29

3

RKSN

121

2 X 30/42

--

4

KNPS

172

2 X 21.6

--

5

GOL

133

2 X 30/42

--

6

BUL

96

2 X 13.5/20

17

8

GP

108

2 X 21.6

15

9

BMB

111

2 X 30/42

17.5

10

BJMD

181

2 X 21.6

19

11

CPE

196

2 X 21.6

17.5

12

CKP

107

2 X 30/42

--

13

NXN

53

21.6

9.5

14

BSPX

156

2 X 21.6

19

15

KOBL

55

2 X 21.6

6.5

16

RSP

245

2 X 21.6

12.5


L
ooking into the future requirement of power supply,TSSs at DTV, GPH, BUF, MOU, CBSA, RRP are under construction on account of construction of 3rd line work in the division.

Remote control system:

The initial strowger type remote control system has been replaced with PC based SCADA system. The number of RTUs hooked to the system are about 80.

Maintenance organisation:

The division has Twelve OHE depots, Three PSI depots, One RCC, One TPC and One Repair depot. 19 tower wagons are utilized for the OHE maintenance work as well as construction and replacement works.

Organization structure and Manpower position:

TRD department is being headed by Sr.DEE/TRD and being assisted by one DEE/TRD and four ADEE/TRDs. The total manpower on roll is 606 and sanction strength is 631. No other activity other than AMC of SCADA is outsourced.

All India TRD Centralised training center:
Chakradharpur division is having one centralized TRD training schoolunder control of Sr DEE/TRD which is imparting trainingto Gr 'C' and Gr 'D' staff of all zonal railways. This school was started in the year 1963 and it is imparting training to about 1000 railway staff in a year.




               
  

     TRD training school at Chakradharpur.                Model room at TRD training school.




Source : South Eastern Railway CMS Team Last Reviewed : 28-06-2021  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.