|
|
|
Sl.no. |
Section |
Works carried Out |
|
1 |
E-1 |
Incoming and Outgoing loco testing, Equipment stripping & lifting and their Connection. |
|
2 |
E-2 |
Cable layout, new cable placement, reconditioning of cable. |
|
3 |
E-3 (TM) |
Traction Motor overhauling (DC & AC). |
|
4 |
E-3 (Aux) |
Overhauling and fitment of auxiliary like MCP, MVMT,MVSI,MVRF, MPH,MVSL, ARNO etc. |
|
5 |
E-4A |
Overhauling and fitment of Vacuum Circuit breaker, Battery charger, DBR,R-118,Head light, Flasher light. |
|
6 |
E-4B |
Overhauling and fitment of Relays, high voltage testing, Microprocessor, STC,MCB. |
|
7 |
E-5 |
Overhauling and fitment of CTF, Reverser, line contactor, C-145,C-118,8.1, 8.2, 8.41. |
|
8 |
E-6 |
Overhauling and fitment of Transformer with SMGR, Tap Changer and VCU. |
|
9 |
E-7&8 |
Overhauling and fitment of RSI panel, Overhauling and fitment of BA panels (1, 2 & 3). |
|
10 |
E-9 |
Overhauling and fitment of Driving Desk & Switch boards. |
|
11 |
Bogie |
Bogie stripping and fitting and testing of wheel with TM on the test bench. |
|
12 |
Pneumatic |
Stripping and fitting for all pneumatic valves, Pipe line, pantograph, gauges, Compressor Overhauling etc. |
|
13 |
Superstructure |
Body repairing, painting, fabrication work, CBC, buffer, hood, protective screen,Wind screen glass etc. |
|
14 |
Technical |
Deals with the Technical matters related to loco POH. |
|
15 |
Stores |
Inventory control of Stock and non-Stock items. |
Seniority list of Technical staff as on 01.01.2022

Accessibility Controls
