|
SIGNAL & TELECOM TRAINING CENTRE KHARAGPUR, S.E.RAILWAY
SIGNAL & TELECOM TRAINING CENTRE KHARAGPUR, S.E.RAILWAY
6TH AVENUE, SOUTH SIDE KHARAGPUR,
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
S |
&T Training Centre, S.E.Railway, Kharagpur, started functioning during 1960’s with a mission for training of S&T artisan staff. Theoretical and Practical classes used to be conducted in Signal Workshop, KGP. Subsequently during 1963 the Training Centre was shifted to
With the rapid introduction of advanced & improved type of Signalling and Telecommunication system it was felt necessary for augment of training capacity. As a result one
(2)
1.GENERAL INFORMATION.
I.Location of the Training Centre:On the
the Southend Side of Kharagpur.
II.Postal address:Signal & Telecom Training Centre,
S.E.Railway.
III.Telephone Numbers:Railway Kharagpur :Principal = Office=62418(RLY),
Residence= 62419(RLY).
Chief Instructor: Office=62720(RLY)
62721 (RES)
STTC Office: 62720 (RLY).
FAX: 63065 (RLY)
DOT (BSNL): 03222-255469.
E-Mail: psttckgp@ser.railnet.gov.in
IV.Total area of the Training Centre: Area of the Campus = 172 mt. X 114 mt.
= 19608 sq. Mt. approx.
V.Timings:
Office Hours:
08/15-12/15 Lunch Break 12/15-13/15
13/15-17/15
Saturday: Half Working day (08/15-12/15)
Sunday & Holiday: Remain Closed.
Classes (Hrs):
Session ISession IITea BreakSession IIISession IV
Hrs.08.30/09.20 09.20/10.1010.10/10.3010.30/11.2011.20/12.10
LUNCH BREAK:12.10 – 13.40
Session VSession VITea BreakSession VII
Hrs13.40/14.-1014.40/15.4015.40/16.0016.00/17.00
Library (Hrs.)As per routine .
(3)
2.INFRASTRUCTURE OF TRAINING CENTRE :
i)Classrooms:
Total Class Room = 05 Classrooms.
Class Room capacity= 25-30 each (in average).
Sitting arrangement=Combined wooden desk and chair (Individual)
ii) Laboratories:There are 7 laboratories equipped with Signal and Telecom
Equipments for the purpose of practical training.
SIGNAL LAB: a) Block and signalLab, b) RRI Lab,c) SSI Lab &
d)MODEL YARDe) IPS. Lab
TELECOM LAB: a) MW &Wireless Lab, b) Landline, Exchange Lab &
c)Computer & e-Learning Lab.
iii. Seminar Hall : Seating capacity 40 – 45 seats.
3.FACILITY AVAILABLEFOR PRACTICAL DEMONSTRATION ON SIGNAL AND TELECOM SUBJECTS:
Block and Signal Lab: The Block lab is equipped with all types of Block
Instrument used in S.E.Railway & a model of Automatic signaling section and DC track circuit model.
RRI Lab:The RRI lab is equipped with a) Siemens RRI (two line stn with
Operating panel) b) British type RRI (two line stn with operating panel and simulation panel of automatic signaling connected with model yard,Datalogger and Eldyne make SSDAC .
EILab:A training EI of two lines Stations along with point & signal
have been installed by S&T construction organisation during February’2002 with single system and warm stand by system is installedin year 2009.
Model Yard:The Model Yard with 4 lines, length 145 mtrs (approx. route
Length) is equipped with Lever frame, Semaphore signal, CLS, Mechanical & Electrical point & one set of Level crossing gate (Lifting barrier type). 4 No. of automatic signals are installed by S& T construction during year 2010.
4-D Universal axle counter, Single section digital axle counter CEL make. Motor signal & Reverser signal etc.
Mechanical Signalling Equipment: Mechanical Siganlling Equipment i.e. Locking tray with locking indication (Direct / IRS catch handle type); various mechanical signalling spares are provided for identification purpose.
MW &Wireless Lab: Wireless lab equipped with active and passive
(4)
components, PA system, equpts for study of different type of GATES, 25 watt VHF set, 2 watt VHF set, DTL MUX, 7D6 Radio equipments etc.
Landline & Exchange Lab: Land line lab is equipped with different types of
Auto telephone, all types of Emergency portable telephone, Head qr. & Way station Control equipment (17 impulse & DTMF type), Optical fibre testing kit, different types of Telecomcables
Electronic Exchange (CDOT-128 port), OFC OLTE (WEBFIL make)
Computer e-Learling Lab : Computer Lab is equipped with 10nos. of PC.
Video Conferencing Room:One room is for Video conferencing with the
entire Zonal Traing centre (S&T) and IRISET/SC.
4.Provision of training facility
i)Details of Training Aids :
oBlack board & white board (Frosted Glass) in classroom.
oWall chart, Painted drawing boards
oOHP & Screen
oTV / VCR / DVD Player(for audio-visual training)
oProjection TV(29”)
oPhotocopier Machine
oDigital Scanner cum Printer
oPC with Printer
ii) Library facilities: New Library room is constructed in year 2010.
The Library is equipped with Technical Books on Signal & Telecom, Manuals, Magazines, Journals, etc.
Total Nos.=3500 (approx.)
5.FACULTYMEMBERS:
i) Sri Anil Ch. Gharai [Principal (ADSTE)]
ii)Sri D.Mukhopadhyay[Chief Instructor (SSE/SIG]
iii)Signal Instructor = 05
iv)Telecom Instructor = 06
6.OBJECTIVES OF THE TRAINING CENTRE:
Details of Training Courses are Conducted (as per approved module for stage wise Training of Gr. ‘C’ including 40% intermediate J.E.(Sig) & 30% intermediate J.E (Tele) & Gr. ‘D’ staff of
|
Sl No. |
Course no. |
General Courses |
Duration (in weeks) |
|
1. |
SNT-1 |
Induction to unskilled Group ‘D’ (Signal & Telecom) |
02 |
|
2. |
SNT-2 |
Initial Course for Apprentice ESM/SM Gr.III |
08+09 |
|
3. |
SNT-2 |
Initial Course for Apprentice ESM/SM for Gr.II |
08+09+08 |
|
4. |
SNT-3 |
Initial course for Apprentice TCM/WTM |
08 + 09 |
|
5. |
SNT-4/5/6 |
Refresher course for ESM/MSM/SM/TCM/WTM |
03 (EACH) |
|
6. |
SNT-7 |
Equipment Courses for Signal Artisan staff on different subjects. |
1 / 2 |
|
7. |
SNT-8 |
Equipment Courses for Telecom Artisan staff on different subjects. |
1 / 2 |
|
9. |
SNT-10 |
Foundation Course for Promotees ESM/MSM Gr.III |
8 |
|
10. |
SNT-11 |
Foundation Course forpromotees TCM /WTM Gr.III |
8 |
|
12. |
SNT-20 |
Induction course for Apprentice JE/SE (Sig & Tele) |
03 |
|
13. |
SNT-21 |
Pre promotional course for ASTE, Gr-B selection |
3/4 |
|
Sl No. |
ExtraCourses |
Duration |
|
1. |
Introduction of signaling to LI/CLI/LP of elect(loco) department |
02 days |
|
2. |
Introduction of signalingand panel operation to ASM/SM/SMR of operating Department. |
02 days |
|
3. |
Panel operation for ASM/SM/SMR for refresher trainees of ZRTI/SINI of operating Department |
01 day |
|
4. |
Disaster Management trainees for supervisors and artisans of S&T Department. |
05 days |
Total number of courses conducted in a year =100(in average).
Course conducted last year (2012) = 99Courses. (Signal: 49& Telecom: 50)
Courses planed for 2013:130courses (Signal: 73 & Telecom: 52, Black Smith: 05 )
Courses conducted till this year upto March 2013: 20 courses (Signal: 14 & Telecom: 06)
7.DETAILS OF COURSE CONDUCTED & UTILISATION OF SEATS
STATEMENT SHOWING THE PERFORMANCE OF STTC/KGP
Jan 2012 - Dec’2012
|
Srl No. |
Name of the Training Programme |
Duration of Training (in weeks) |
Dec’12
|
Total Course conducted fromJan’12 |
Total staff attended from Jan’ 12 |
||
|
No. Of Course conducted |
Seat allotted |
Attended* |
|||||
|
1. |
Refresher ESM/MSM |
03 |
2 |
50 |
44 |
14 |
336 |
|
2. |
Refresher TCM/WTM |
03 |
1 |
50 |
36 |
12 |
217 |
|
3. |
Equipment ESM/MSM |
01 / 02 |
2 |
20 |
19 |
9 |
102 |
|
4. |
Equipment TCM/WTM |
01 / 02 |
4 |
80 |
32 |
24 |
219 |
|
5. |
Induction SIG KSI |
01/ 02 |
NIL |
NIL |
NIL |
3 |
18 |
|
6. |
InductionTELE/MW KSI |
01 / 02 |
NIL |
NIL |
NIL |
10 |
71 |
|
7. |
Initial Appr.SM (PH-I) |
08 |
NIL |
NIL |
NIL |
1 |
32 |
|
8. |
Initial Appr.SM (PH-II) |
09 |
1 |
32 |
32 |
2 |
82 |
|
9. |
Initial Appr.SM (PH-III) |
08 |
NIL |
NIL |
NIL |
1 |
46 |
|
10. |
Initial Appr.WTCM(PH-I) |
08 |
NIL |
NIL |
NIL |
1 |
6 |
|
11. |
Initial Appr.WTCM(PH-II) |
09 |
NIL |
NIL |
NIL |
1 |
6 |
|
12. |
Foundation Course for PromoteesWTCM-III |
08 |
NIL |
NIL |
NIL |
2 |
23 |
|
13. |
Foundation Course for Promotees ESM-III & MSM-III |
08 |
NIL |
NIL |
NIL |
04 |
101 |
|
14. |
Inter Appr. ForJE-II(Tele)Ph-I |
8 |
NIL |
NIL |
NIL |
1 |
6 |
|
|
Inter Appr.ForJE-II(Tele)Ph-II |
9 |
NIL |
NIL |
NIL |
1 |
7 |
|
15. |
Inter Appr. ForJE-II (Sig) Ph-I |
8 |
NIL |
NIL |
NIL |
1 |
6 |
|
16. |
Inter Appr. ForJE-II (Sig) Ph-II |
9 |
1 |
6 |
6 |
1 |
6 |
|
17. |
Introduction Course for SE/JE(SIG/Tele) |
04 |
NIL |
NIL |
NIL |
5 |
22 |
|
18. |
Panel Operation training/seminar for ASMs /SMs of SER |
01day |
2 |
45 |
45 |
10 |
335 |
|
19. |
Gr’B’ Promotional Course for SE&SSE’s |
03 |
NIL |
NIL |
NIL |
1 |
10 |
|
20. |
Disaster Management( Sup. & Artisien) |
01 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
21 |
Appreciation for SM-II&III |
01 |
NIL |
NIL |
NIL |
NIL |
NIL |
TOTAL à
|
-- |
13 |
283 |
214 |
105 |
1684 |
|
|
Total attended upto December ’12:1684 Cumulative Training Capacity from Total Trainee days from Cumulative seat Utilization:66.99% |
(6)
STATEMENT SHOWING THE PERFORMANCE OF STTC/KGP
Feb’2013
|
Srl No. |
Name of the Training Programme |
Duration of Training (in weeks) |
Feb ’13
|
Total Course conducted fromJan’13 |
Total staff attended from Jan’ 13 |
||
|
No. Of Course conducted |
Seat allotted |
Attended* |
|||||
|
1. |
Refresher ESM/MSM |
03 |
2 |
50 |
50 |
3 |
72 |
|
2. |
Refresher TCM/WTM |
03 |
1 |
20 |
16 |
2 |
34 |
|
03. |
Equipment ESM/MSM |
01 / 02 |
4 |
60 |
36 |
6 |
51 |
|
4. |
Equipment TCM/WTM |
01 / 02 |
1 |
15 |
10 |
2 |
17 |
|
5. |
Induction SIG KSI |
01/ 02 |
1 |
10 |
7 |
4 |
21 |
|
6. |
InductionTELE/MW KSI |
01 / 02 |
NIL |
NIL |
NIL |
1 |
7 |
|
7. |
Initial Appr.SM (PH-I) |
08 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
8. |
Initial Appr.SM (PH-II) |
09 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
9. |
Initial Appr.SM (PH-III) |
08 |
01 |
13 |
13 |
01 |
13 |
|
10. |
Initial Appr.WTCM(PH-I) |
08 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
11. |
Initial Appr.WTCM(PH-II) |
09 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
12. |
Foundation Course for PromoteesWTCM-III |
08 |
01 |
36 |
20 |
01 |
20 |
|
13. |
Foundation Course for Promotees ESM-III & MSM-III |
08 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
14. |
Inter Appr.ForJE-II(Tele)Ph-I |
8 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
|
Inter Appr.ForJE-II(Tele)Ph-II |
9 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
15. |
Inter Appr. ForJE-II (Sig) Ph-I |
8 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
16. |
Inter Appr. ForJE-II (Sig) Ph-II |
9 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
17. |
Introduction Course for SE/JE(SIG/Tele) |
04 |
03 |
03 |
03 |
6 |
6 |
|
18. |
Panel Operation training/seminar for ASMs /SMs of SER |
01day |
01 |
53 |
53 |
03 |
119 |
|
19. |
Gr’B’ Promotional Course for SE&SSE’s |
03 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
20. |
Disaster Management( Sup. & Artisien) |
01 |
NIL |
NIL |
NIL |
NIL |
NIL |
|
21 |
Appreciation for SM-II&III |
01 |
NIL |
NIL |
NIL |
01 |
03 |
TOTAL à
|
-- |
15 |
260 |
215 |
29 |
363 |
|
|
Total attended up to Feb ’13=363 Actual attended=149 |
(7)
9. STTC Campus Facility:
1.Two bed Ac guest room for officers is provided with separate entrance and exit.
2.YOGA facilities: A Yoga session for all the traineesis conducted at morning time by private yoga instructor.
3.Library facilities: The modern Library is equipped with Technical Books on Signal & Telecom, Manuals, Magazines, Journals, IRISET and IRCAMTECH notes of sig & tele .
4.Drinking water : The drinking water facilities is available with aquagaurd.
5.Beautification and environment development with greeneries and seasoned flowers.
10. HOSTEL FACILITY:
Accommodation:
There is a two-storied building in the same campus of the Training Centre. Total rooms = ground floor=21 Nos & First floor = 16 Nos.
Total Living room (Ground floor = 15 Nos., First floor = 15) = 30 Nos,Total capacity=120 beds (approx)Capacity of Dinning Hall=72 .
Ladies accommodation :Separate three rooms along with bath rooms and toilets
Messing facilities: The mess is managed by a committee comprising
Representative from the trainees and a few members of
S&T Instructors. Cooking, serving& Cleaning of
Commodities done through Contractor.
Drinking water :The drinking water facilities is available with
aquagaurd.
Kitchen facilities:provided by commercial chimney (Kuchina
Make ) to balance the environment of dining
hall as well as kitchen.
Recreation facility:
1.Common recreation room: provided with 29” TV and indoor games facility.
2.Ladies recreation room: provided with TV.
Internet : one separate room is equipped with PC with broadband
11.Medical facilities:
from the Training Centre. Trainees availtheMedical
facility through
12.Sports facilities available:
Indoor games: a) Chess, b) Carrom, c) Table-Tennis.
Outdoor games: a) Badminton, b) Volley ball, c) Football d) Cricket.
13.
(Our weaknesses)
·Modernization of the five no. class rooms and seminar hall, principal room and office room.
·Provision of modern signaling equipments like MSDAC, BPAC by Block Panel, WESTRACE EI, IBS with UFSBI, RDSO panel etc.
·Provision of modern Telecom equipments like TEJAS STM-I, IPIS etc
·Modification for ladies accommodation in hostel.
·Provision of the separate yoga place.
·Provision for requisite furniture at Trainee class room.
·Provision for modern teaching aids in each class room.
·Provision for one Basket Ball court at Trainee Hostel to improve sports activity.
·Construction of one auditorium sitting capacity 120-130 at the Training Centre campus.
Kharagpur
05.03.2013(A.C.Gharai)
Principal
S&T Training Centre
Kharagpur, S.E.Railway

Accessibility Controls