Indian Railway main logo
Search :
Increase Font size Normal Font Decrease Font size
   View Content in Hindi
National Emblem of India

Home

Citizen Charter

Divisions

Department

Tenders & Bill Status

News & Updates

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS

Innovation & Initiatives taken towards system improvement

Apart from the regular maintenance work, the division has taken up various innovative works for implementation of advance technologies like :

Energy conservation

Capacitor banks have been installed at all traction sub-station of RNC -division a move towards energyconservation. In the year 2013-14, an amount of Rs. 99.35 Lakhs have been received as rebate fromJSEB for these TSSs in the Traction Energy Bills, for maintaining PF above 95%.

Introduction of Advance Technology

Thermography of Traction installations as a preventive measure to detect the hot spots in Tr-Dinstallations thermography checking by Thermal Vision Camera is being done, hence anydefects/discrepancies can be attended  well before the unusual occurrences.

GPS based OLIVER-G Current collection system

In order to monitor the smooth negotiation of pantograph o­n contact wire and occurrences of heavyflashes during passage of pantographs, the GPS based OLIVER-G Current collection system is beingused as a preventive measure.

he OLIVER Make RT Software supplied with the unit identifiessparks in real time and save them asimages with locations as well as in video format. These images can be analyzed to recognize the type ofspark with its location.

Tan delta (Tan δ) testing

Tan delta test kit is being used for checking leakage current of bushings of power transformer, CurrentTransformer and Potential transformer.

Circuit Breaker Analyzer

In order to test the dynamic performance of circuit breakers, CB analyzer is being used in Ranchi Divisionas a condition monitoring system.

Logistic solution for overhead bunker loading in Electrified section

A special arrangement has been made at Rajrappa Washery siding by Providing 25 KV Tractionunderneath the chute of loading Bunker to facilitate passing of Electric Loco in Power o­n condition,loading can thus be done in EOT position.       

Stagger checking and video recording of section with the help of GPS based OLIVER-G

In this system, stagger checking is being done with the help of GPS based OLIVER-G. The actual staggerand accurate location of traction masts are displayed o­n Laptop and also continuous video recording ofstagger of entire section is done. By this system stagger checking is being done by o­ne person o­nly andlater is can also be analyzed in the Depot/office.

Distribution of Handy computerized sectioning diagram to skilled artisan staff

Computerized updated OHE sectioning diagram of Ranchi Division has been prepared and copies ofcolourful printout of depot jurisdiction wise OHE sectioning diagram has been given to skilled artisanstaffs. This will enhance safety at the time of availing Power block.

Model OHE at important OHE Depot

Model OHE has been erected at major OHE Depot for field training to artisan staff. Various mock drills arebeing organized among staff for early Breakdown restoration.




Source : South Eastern Railway CMS Team Last Reviewed on: 09-07-2014  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.